Economics of Utility Lateral Trimming
(View PDF)
Richard A. Johnstone
Abstract: The implementation of lateral trimming, proper crew scheduling, tree removal and/or replacement and growth regulator injections were proposed in 1982 as techniques necessary for a utility manager to stretch available funds in order to maintain a reliable electric system. Expectations were exceeded at Delmarva Power as these techniques allowed the budget to be reduced while reliability was improved.
Keywords:
https://doi.org/10.48044/jauf.1988.017
|